Tests of Controls

Evaluate each control tested, and conclude whether reliance on it is supported by the work recorded.

  • Ledger + tests of controls summary

How the result is read

A deviation rate seen in a sample is not the rate in the population (ISA 530.A21, AU-C 530.A27). For a control run daily or many times a day the population is large, so the sample gives an upper deviation limit: at 90% confidence, the Poisson factor for the deviations found — 2.31 for none, 3.89 for one, 5.33 for two — over the sample size, and reliance is supported only when that limit is within the tolerable deviation rate. A monthly or quarterly control has too few occurrences for that arithmetic; practice asks for a minimum sample by frequency, with no deviation at all. Where reliance is not supported, the controls cannot reduce the substantive work.

In the application

Tests of Controls is filed under Completion, index letter L. "Run all analyses" runs it with every other analysis the ledger and the documents loaded can answer. The worksheet states the population it tested on its face — or "Not applicable" with the reason when a column it depends on is empty — and the Excel workbook the engagement exports files it under L, beside an index of the source files with their SHA-256 fingerprints.

Run your next audit file test without the Excel crash.

One free engagement to evaluate, valid 60 days. The ledger never leaves the machine.

  • 20 minutes
  • Runs on a fictional engagement
  • No client data required

Cookie settings

This site sets no cookies. It keeps one preference in your browser's localStorage — the currency you chose on the pricing pages — and its analytics are cookieless, so there is nothing to opt in or out of.

View Cookie Policy